Dual Power Design: Subfloor Electrical Layout (Week #3)

Dual Power Design: Subfloor Electrical Layout (Week #3)

Last week, the outdoor generator atrium was cleared of debris, and we saw tunnels being dug out in preparation for underground conduit to support the power systems and house electrical wires.

The next step involves laying out the conduit, which will connect the UPS power rooms to the outside generators. Neatly engineered under the data center floor, the electrical system will deliver fault tolerant dual (A-B) power to customer equipment from three separate utility rooms, backed by four 2MW generators.

A team of electricians worked toward finishing this subfloor highway, which will safely and efficiently power the data center. Multiple pathways ensure added redundancy.

 

Tags: , , , , ,

This post was written by:

- who has written 29 posts on THE CONTINUITY COUNCIL.

Holly Gary is the marketing.PR.social.web.blog.director for FIBERTOWN. With an extensive background in the information technology industry, Holly brings energy and passion to all things tech and marketing. She can be found taking photographs, painting, cycling, swimming, crossfitting or cooking in her spare time.

Contact the author

Leave a Reply

Alltop, confirmation that we kick ass


Colocation Data Centers Houston

Get Email Updates

 

Connect with us

                              

Photos on flickr